Completed Projects (VORSEP)
  • Source: Single Tube TAS 900 Dust Collection System
  • Premise: Oil Palm Fiber / Shell Fired Boiler
  • Location: Panching, Pahang
  • Model No: -
  • Emission Guarantee (mg/Nm³@12%CO2): 400
  • Source: Single Tube Dust Collection System
  • Premise: Oil Palm Fiber / Shell Fired Boiler
  • Location: Neram, Pahang
  • Model No: TAS 900
  • Emission Guarantee (mg/Nm³@12%CO2): 400
  • Source: Single Tube Dust Collection System
  • Premise: Oil Palm Fiber / Shell Fired Boiler
  • Location: Lepar Hilir, Pahang
  • Model No: TAS 900
  • Emission Guarantee (mg/Nm³@12%CO2): 400
  • Source: High Efficiency Dust Collectors
  • Premise: Oil Palm Fiber / Shell Fired Boiler
  • Location: East Oil Mill, Pulau Carey, Selangor
  • Model No: -
  • Emission Guarantee (mg/Nm³@12%CO2): 400