Completed Projects (VORSEP)
  • Source: 45 t/h Oil Palm Fiber/Shell Fired Boiler
  • Premise: Palm Oil Mill
  • Location: Ulu Basir, Perak
  • Model No: TAS 100/100, H28V14
  • Emission Guarantee (mg/Nm³@12%CO2): 150
  • Source: 2 x 36 t/h Sugar Baggase Fired Boilers
  • Premise: Sugar Mill
  • Location: Roxas, Capiz, Philippines
  • Model No: 2 units of TAS100/100, H18V14
  • Emission Guarantee (mg/Nm³@12%CO2): 120
  • Source: 25 t/h Oil Palm Fiber/Shell Fired Boiler
  • Premise: Palm Oil Mill
  • Location: Trolak, Perak
  • Model No: Upgrade from TAS 100 to TAS 100/100, H24V10
  • Emission Guarantee (mg/Nm³@12%CO2): 150